tACT Release 4.0

We are pleased to announce the availability of the Team Activity Coordination Tool (tACT) Release 4.0. This release contains the following new features along with bug fixes:

    • Activity Linking

    • Dynamic time delineation

    • Constraint text displayed on main Activity Template Editor page

    • Separate window for constraint report

    • Expand/Contract All option

    • Dropdown option of existing Activities/Events/Attributes for constraints

    • Constraint text added to hover

    • Printing

    • Enable/Disable Activity Template

    • Firefox compatibility

    • Status report customization

    • Mechanism to load XML reports into MS Excel for Mac

    • Expand list in calendar view when +x displayed

    • Attributes to placed activities

    • Event attribute filtering

    • Updates to CSV output and DSN resources as 2 in CSV

    • Ability to select time zone for display

    • Ability to select event files to ingest

    • Interval display line

    • Save activity moves

    • Remove link sub-menu

    • Attributes listed in the hover information need to be filtered

    • Allow user to order columns in CSV output

    • CSV rendered chronologically

    • Display event types in attribute list in CSV output

    • Remove window start / stop time in CSV output

    • Allow Administrators to manage user privileges

    • CSV output should limit activities/events to what would be present in the timeline view

    • Activity mouse-over/click needs to wrap description so the box doesn’t takeover the whole screen

    • Ability to set a favorite to a timeline so they could show on the list first

    • Ability to show the notes in the click display of activities

.